Congratulations to the August Yard of the Month winners!
First Place:  4407 Amberley Place
Runner up: 4215 Conway Court
Congratulations to the July Yard of the Month winners!
First Place:  2024 Ravenstone Loop
Runner up: 2122 Rockcliff Loop
Congratulations to the June Yard of the Month winners!
First Place:  2114 Rockcliff Loop
Runner up:  2436 Stone Castle
Congratulations to the May Yard of the Month winners!
First Place: 4400 Hearst Ct.
Runner Up: 4400 Amberley

“The City of College Station is holding a free irrigation workshop at the College Station Utilities Meeting & Training Facility (1603 Graham Road) THIS Saturday, August 3. The workshop will begin at 10:00 AM and will end by 11:30 AM.

The City of College Station encourages residents with an irrigation system to attend and get the latest information about smart irrigation! Topics covered will include irrigation system basics, figuring out how to program your controller, and how to get weekly irrigation recommendations from http://bvwatersmart.tamu.edu.

This event is free for all College Station water customers. Participants will receive handouts, gift card, and door prizes. Registration preferred but not required. Register by emailing jnations@cstx.gov or call 979-764-6223.”

Jennifer Douglass Nations
Water Resource Coordinator
City of College Station

Office: 979-764-6223
Mobile: 979-739-8424
Fax: 979-764-3752

The Castlegate Yard of the Month Program has been updated!
From May – November two yards per month will be selected as winners.  First prize will receive a $50.00 gift card and the Runner Up will receive a $25.00 gift card.  All of the monthly prize winners will be entered into a drawing for a $200.00 Grand Prize gift card to be awarded at the Castlegate Annual Meeting.  You must be present at the meeting to win.  There will be four $25.00 gift cards awarded in December for the Holiday Lights & Decorations.

Weathering permitting Aggieland Pressure Wash will be cleaning the Hwy 40 Entrance walls on May 14. After the area dries out, G&W Electric will remove existing lights and install New LED Entrance Lights mounting them on the entrance walls the week of May 20.

The city currently has completed most of their investigations and are early on in design and developing construction plans for the Greens Prairie Trail Phase 2.

Once they get further along in design they will come back for another public meeting to show how the layout has progressed based on their investigations, engineering design and any comments. Since this project covers a larger area it will be several months before they are ready to present the design again.

Here is a link to the website that shows the exhibits that were presented at the Phase 2 Public Meeting.

http://www.cstx.gov/index.aspx?page=4066

If you have any questions or comments please feel free to give James Smith a call or email.

Phone: 979-764-3877
Email: jsmith@cstx.gov